RERA No:
K-RERA/PRJ/ERN/163/2024
Walkthrough
Structure | : | Deep Pile Foundation. RCC Framed structure & walls with concrete blocks |
Flooring | : | Vitrified tile flooring, Anti-skid Matt tiles for Bathrooms and Balconies |
Kitchen | : | Counter with Granite top, Dado tiles up to 60 cm height from counter top and single bowl sink with drain board. |
Toilets | : | Sanitary fixtures of make Jaguar or Equivalent including wall hung EWC and Wash basin. Best quality Wall tiles, Provision for Exhaust fan in all toilets. |
Doors and Windows | : | Paneled entrance door, Moulded flush doors for bed rooms and toilets, UPV/ Aluminium Fabricated Windows with combination of fixed and sliding/openable panels . |
Painting | : | Putty finished emulsion paint for internal walls, Enamel paint for Doors &grills, Emulsion for external walls. |
Electrical | : | Electrical Three Phase power supply with concealed conduit wiring in PVC conduits controlled by ELCB and MCB, Elegant modular switches of premium make. |
Lift | : | Two fully automatic Lifts (One passenger lift and one Service lift) with intercom facility |
Water Supply | : | KWA water supply subject to rules & regulations and availability Ground water supply from open wells or borewells, depending on availability Water supply through UG sump tank and OH water tank with adequate storage capacity. |
Fire | : | Fire fighting arrangements as per Kerala Fire Fighting Department norms |
Generator | : | Full back up for common lights, pumps, lift etc. and in apartment up to 750 watts |
Internet | : | TV and Internet provision in Living and Master bedroom. |